Bathroom remodeling done watertight.

In South Florida's humidity, what's behind the tile matters more than the tile itself. We build every shower on a properly waterproofed base so it looks good for years.

Popular bathroom projects

Tub-to-shower

Replace an unused tub with a walk-in shower, glass enclosure, and niche.

Waterproofing

Sheet or liquid membrane systems with a flood test before tile goes in.

Tile & vanities

Large-format porcelain, floating vanities, and new mirrors and lighting.

Aging-in-place

Curbless showers, grab-bar blocking, comfort-height toilets, and wider doors.

The process

Typical bathroom sequence

Most bathrooms take 3–5 weeks of construction once materials are on site.

  1. 01Design, tile and fixture selection, permit if required
  2. 02Demolition down to studs and subfloor where needed
  3. 03Plumbing and electrical rough-in, inspection
  4. 04Waterproofing, flood test, tile installation
  5. 05Vanity, fixtures, glass, paint, and final walkthrough

Bathroom FAQ

We only have one bathroom. What do we do?

We'll sequence work to restore the toilet each evening whenever possible and tell you in advance which days the bathroom will be fully out of service.

What if we find water damage?

Hidden rot or damage is common in older bathrooms. We'll stop, show you photos, and price the repair as a written change order before continuing.