Kitchen remodeling, from layout to last light fixture.

Whether it's new cabinet doors or knocking out a wall, we plan the kitchen around how you actually cook and live — then coordinate every trade to build it.

Remodeled kitchen with dark cabinets and white counters

What a kitchen project can include

Cabinets

New stock or semi-custom cabinets, or refacing existing boxes with new doors and hardware.

Countertops

Quartz, granite, and solid surface — templated after cabinets are set for an exact fit.

Backsplash & floors

Tile backsplashes and flooring that runs continuously into adjoining rooms.

Lighting & electrical

Recessed, under-cabinet, and pendant lighting, plus new circuits by a licensed electrician.

Plumbing changes

Sink relocations, dishwasher and ice-maker lines, handled by licensed plumbers.

Layout changes

Opening walls, adding islands, and reworking the work triangle — with permits as required.

The process

Typical kitchen sequence

Construction usually runs 4–8 weeks, depending on scope and how quickly cabinets and countertops arrive.

  1. 01Measure, design, and select materials
  2. 02Permits and cabinet ordering
  3. 03Demolition, rough plumbing and electrical, inspection
  4. 04Drywall, cabinets, then countertop template and install
  5. 05Backsplash, fixtures, paint, final inspection and walkthrough

Kitchen FAQ

Can I keep my appliances?

Yes. Give us model numbers early so cabinets are sized to fit them.

What's an allowance?

If you haven't chosen certain finishes yet, the proposal includes a set allowance for them. If your final choice differs, the difference is adjusted by written change order.

Let's plan your kitchen.