Kitchen remodeling, from layout to last light fixture.
Whether it's new cabinet doors or knocking out a wall, we plan the kitchen around how you actually cook and live — then coordinate every trade to build it.
What a kitchen project can include
Cabinets
New stock or semi-custom cabinets, or refacing existing boxes with new doors and hardware.
Countertops
Quartz, granite, and solid surface — templated after cabinets are set for an exact fit.
Backsplash & floors
Tile backsplashes and flooring that runs continuously into adjoining rooms.
Lighting & electrical
Recessed, under-cabinet, and pendant lighting, plus new circuits by a licensed electrician.
Plumbing changes
Sink relocations, dishwasher and ice-maker lines, handled by licensed plumbers.
Layout changes
Opening walls, adding islands, and reworking the work triangle — with permits as required.
Typical kitchen sequence
Construction usually runs 4–8 weeks, depending on scope and how quickly cabinets and countertops arrive.
- 01Measure, design, and select materials
- 02Permits and cabinet ordering
- 03Demolition, rough plumbing and electrical, inspection
- 04Drywall, cabinets, then countertop template and install
- 05Backsplash, fixtures, paint, final inspection and walkthrough
Kitchen FAQ
Can I keep my appliances?
Yes. Give us model numbers early so cabinets are sized to fit them.
What's an allowance?
If you haven't chosen certain finishes yet, the proposal includes a set allowance for them. If your final choice differs, the difference is adjusted by written change order.